Client project

Capacity increase and upgrading of the wastewater treatment plant

Municipality of Saint-Isidore Chemin des Étangs, St-Isidore (QC) G0S 2S0
Construction cost
$5M
Duration
10 months
Schedule
August 2024 to May 2025
Disciplines
6 trades
Client
Municipality of Saint-Isidore
Location
Chemin des Étangs, St-Isidore (QC) G0S 2S0
Project type
Wastewater treatment plant upgrade

At a glance

Project description

The project involved increasing the capacity and upgrading the wastewater treatment plant of the Municipality of Saint-Isidore. The work included, but was not limited to:

Scope of work

Work performed

  • Dismantling of the lift station, the flow measurement chamber and various overflow chambers and pipes
  • Dismantling of the SMBR and off-site reinstallation of the tank as a fire-water reserve
  • Replacement of numerous sewer lines (revision of the hydraulic network of the existing lagoons)
  • Replacement of the sewer manhole
  • Construction of a new reinforced concrete basin for the RBGS and aerated lagoon no. 1
  • Construction of a service building housing the fine screening room and the electrical room
  • Construction of a new lift station with prefabricated wet well
  • Addition of aerators in two (2) existing lagoons
  • Installation of an odour treatment system for the fine screening room
  • Construction of a prefabricated UV disinfection chamber
  • Replacement of the coagulant dosing system
  • Replacement of the two (2) motors, pulleys and belts of the SMBR building blowers
  • Installation of a generator with transfer switch
  • Installation of various process mechanical equipment
  • Installation of various electrical, ventilation and plumbing equipment
  • Various excavation, backfilling and site grading work
  • Sodding of certain areas
  • Commissioning tests
  • Site restoration

Planning municipal infrastructure work? Get our team’s input.

Request a quote

On site

Project challenges

  • Keeping the plant in operation throughout the work
  • Continuous water management for the duration of the work
  • Exploratory test pits to locate existing infrastructure
  • Protection of existing structures, installations and works
  • Excavation adjacent to structures and public utility networks
New reinforced concrete basin under construction at the Saint-Isidore wastewater treatment plant
Construction of the new reinforced concrete basin for the RBGS and aerated lagoon no. 1.

Services provided

  • Construction management
  • Project management
  • Subcontractor management
  • Testing

Disciplines

  • Process mechanics
  • Civil engineering
  • Building and formwork
  • Plumbing
  • Electrical
  • Ventilation – air conditioning

Group division

Delivered with CWA Process Engineering

This project was delivered with CWA Process Engineering, the Groupe ALLEN division specialising in process mechanics and water infrastructure. A single team therefore covered the civil works, the building and the full treatment process — from fine screening through to UV disinfection and commissioning tests.

  • Wastewater treatment
  • Process mechanics
  • Municipal infrastructure
  • Fine screening
  • UV disinfection
  • Commissioning
CWA crew working on a water treatment installation

Planning a similar project?

Our team supports municipalities and project owners from design through commissioning.