Client project
Capacity increase and upgrading of the wastewater treatment plant
- Construction cost
- $5M
- Duration
- 10 months
- Schedule
- August 2024 to May 2025
- Disciplines
- 6 trades
- Client
- Municipality of Saint-Isidore
- Location
- Chemin des Étangs, St-Isidore (QC) G0S 2S0
- Project type
- Wastewater treatment plant upgrade
At a glance
Project description
The project involved increasing the capacity and upgrading the wastewater treatment plant of the Municipality of Saint-Isidore. The work included, but was not limited to:
Scope of work
Work performed
- Dismantling of the lift station, the flow measurement chamber and various overflow chambers and pipes
- Dismantling of the SMBR and off-site reinstallation of the tank as a fire-water reserve
- Replacement of numerous sewer lines (revision of the hydraulic network of the existing lagoons)
- Replacement of the sewer manhole
- Construction of a new reinforced concrete basin for the RBGS and aerated lagoon no. 1
- Construction of a service building housing the fine screening room and the electrical room
- Construction of a new lift station with prefabricated wet well
- Addition of aerators in two (2) existing lagoons
- Installation of an odour treatment system for the fine screening room
- Construction of a prefabricated UV disinfection chamber
- Replacement of the coagulant dosing system
- Replacement of the two (2) motors, pulleys and belts of the SMBR building blowers
- Installation of a generator with transfer switch
- Installation of various process mechanical equipment
- Installation of various electrical, ventilation and plumbing equipment
- Various excavation, backfilling and site grading work
- Sodding of certain areas
- Commissioning tests
- Site restoration
Planning municipal infrastructure work? Get our team’s input.
Request a quoteOn site
Project challenges
- Keeping the plant in operation throughout the work
- Continuous water management for the duration of the work
- Exploratory test pits to locate existing infrastructure
- Protection of existing structures, installations and works
- Excavation adjacent to structures and public utility networks

Services provided
- Construction management
- Project management
- Subcontractor management
- Testing
Disciplines
Group division
Delivered with CWA Process Engineering
This project was delivered with CWA Process Engineering, the Groupe ALLEN division specialising in process mechanics and water infrastructure. A single team therefore covered the civil works, the building and the full treatment process — from fine screening through to UV disinfection and commissioning tests.
- Wastewater treatment
- Process mechanics
- Municipal infrastructure
- Fine screening
- UV disinfection
- Commissioning

Planning a similar project?