- Construction cost
- 7,3 M$
- Duration
- 8 months
- Schedule
- November 2020 to June 2021
- Disciplines
- 2 trades
- Client
- Quebec Infrastructure Society
- Location
- 5, Ste-Anne Street, Rivière-du-Loup (QC)
- Project type
- SQI – Formwork lot for senior cottages
At a glance
Project description
The project consists of the supply, installation of formwork, concrete and finishing of the work for the construction of the Rivière-du-Loup seniors’ home. The work includes but is not limited to:
Scope of work
Work performed
- Manufacture and assembly of formwork
- Manufacture of temporary shoring works
- Supply and installation of concrete
- Installation of all elements embedded in concrete
- Finishing of concrete surfaces
- Stripping
Planning municipal infrastructure work? Get our team’s input.
Request a quoteOn site
Project challenges
- Management of works in compliance with LEED standards
- Inserting insulation into foundation walls
- Work during the winter period
- Work done with a tower crane
- 8000 m3 of concrete placed
- Architectural finish for concrete columns with CSC4 finish
- Project winning the 2023 ACI Low-Rise Building Award
Services provided
- Project management
- Subcontractor management
- Quality control
Disciplines