Project description
The project consisted of the replacement and redevelopment of the 48-inch and 60-inch diameter drinking water supply and distribution pipes, cleaning, disinfecting and installing wall valves inside different cells of the water reserve, and the construction of new valve chambers.
Planning municipal infrastructure work? Get our team’s input.
Request a quoteOn site
Project challenges
- Oversized project: 48-inch diameter pipes
- Installation of cofferdams in the cells using divers in order to install the wall valves in dry conditions
- Welding of pipeline sections on site
- Cleaning and disinfection of the cells of the 150 km3 reservoir affected by the work of installing wall valves and sleeves
- Maintaining the pumping station in operation during the works
Services provided
- Construction
Disciplines
Group division
Delivered with CWA Process Engineering
The process-mechanical expertise on this site comes from CWA Process Engineering, the Groupe ALLEN division dedicated to water infrastructure. Drinking-water mains of 48 and 60 inches, wall valves installed in dry conditions and the return to service of the reservoir cells all demand full command of the drinking-water chain.
- Drinking water
- Process mechanics
- Pumping station
- Water distribution networks
- Wall valves